AGE Engineering was selected to provide survey services in support of LG&E – Cane Run Natural Gas Combined Cycle Turbine project. LG&E is constructing a new 640 megawatt natural gas (NGCC) turbine that will replace the coal-fired generating units at the Cane Run Station. AGE was tasked with staking and as-builting the 7.3 mile long gas transmission line.